2. Disconnect the cables of the standard Ethernet board and standard USB board.
3. Cover the standard connection points with the caps to prevent accidental reconnection of the standard
cables.
4. Remove the cover of Slot B [1] (
x 2).
5. Insert the Gigabit Ethernet Board [2] into Slot B (Knob
x 2).
6. Attach the ferrite core provided with the Gigabit Ethernet Board to the end of the cable [1] to be
attached to the network.
7. Attach the ferrite core provided with the main machine to the end of the cable [2] to be attached to
the main machine.
1. Installation
98
1
Содержание Neptune-P1
Страница 1: ...Neptune P1 Machine Code G180 SERVICE MANUAL June 2007 Subject to change...
Страница 13: ...Folder D889 452 Manual Feeder D333 453 Paper Cassette B853 454 Main Machine Configuration 455 12...
Страница 103: ...1 Installation 102 1...
Страница 111: ...Fusing Gears 1 Fusing Gears Barrieta S552R Apply to the surface of the rim 2 Preventive Maintenance 110 2...
Страница 114: ...Rear Cover 1 Rear cover x 2 A 2 Controller cover B x 1 Paper Exit Unit Common Procedures 113 3...
Страница 142: ...RF Exit Sensor 1 Open the drawer of the roll feeder 2 Plate A x 2 3 RF exit sensor B x 1 x 1 Paper Feed 141 3...
Страница 170: ...5 Remove the PSU A x1 x10 x all Controller Board 1 Remove A Rear cover x2 B Controller cover x1 Boards 169 3...
Страница 177: ...3 Remove the SFDB A x 2 x 2 standoffs x 2 3 Replacement and Adjustment 176 3...
Страница 180: ...4 Remove the cooling fan D x3 x1 Others 179 3...
Страница 402: ...Toner End Recovery Flow Chart Development 401 6...
Страница 449: ...6 Details 448 6...
Страница 457: ...MEMO 456...