• Do not add the second pack at this time.
• Open the first pack of developer [1].
• Slowly add the developer from the first pack into the development unit, as you move the pack
from left to right until the pack is empty.
• An equal amount of developer must be spread along the entire open slot of the development
unit.
6. Close the toner hopper cover [2].
7. Close the upper unit [3].
8. Connect the power supply cord. Switch the main power switch on. The main motor switches on and
distributes the developer evenly inside the development unit.
9. Wait about 10 sec.
10. Turn the main power switch off.
11. Disconnect the power cord.
12. Open the upper unit.
13. Open the toner hopper cover.
14. Open the second 1 kg pack of developer, then slowly add it to the development unit. Move the pack
from left to right until it is empty.
15. Use a clean cloth to clean the edges around the slot of the development unit.
16. Close the upper unit.
Main Machine Installation (G180)
31
1
Содержание Neptune-P1
Страница 1: ...Neptune P1 Machine Code G180 SERVICE MANUAL June 2007 Subject to change...
Страница 13: ...Folder D889 452 Manual Feeder D333 453 Paper Cassette B853 454 Main Machine Configuration 455 12...
Страница 103: ...1 Installation 102 1...
Страница 111: ...Fusing Gears 1 Fusing Gears Barrieta S552R Apply to the surface of the rim 2 Preventive Maintenance 110 2...
Страница 114: ...Rear Cover 1 Rear cover x 2 A 2 Controller cover B x 1 Paper Exit Unit Common Procedures 113 3...
Страница 142: ...RF Exit Sensor 1 Open the drawer of the roll feeder 2 Plate A x 2 3 RF exit sensor B x 1 x 1 Paper Feed 141 3...
Страница 170: ...5 Remove the PSU A x1 x10 x all Controller Board 1 Remove A Rear cover x2 B Controller cover x1 Boards 169 3...
Страница 177: ...3 Remove the SFDB A x 2 x 2 standoffs x 2 3 Replacement and Adjustment 176 3...
Страница 180: ...4 Remove the cooling fan D x3 x1 Others 179 3...
Страница 402: ...Toner End Recovery Flow Chart Development 401 6...
Страница 449: ...6 Details 448 6...
Страница 457: ...MEMO 456...