Series SCK, Size 25-25-100
Page 19
9220-003-en
Revision 14
TM 10272
Edition 01/2021
7.10 Assembly
Assembly is performed in the reverse sequence to
dismantling.
7.10.1 Pour in oil into the bearing
pedestal!
Oil quantities:
For group 0
appr. 150 ml
Type of oil:
See
Section 7.2.2
.
Procedure for filling with oil:
➢
Pull the plastic container out of the holder.
➢
Unscrew the plastic container and fill it with oil.
➢
Screw the plastic container shut and insert it into
the holder.
➢
If the oil level still drops too far, add oil to the plas-
tic container again.
Fig.11
7.11 Tests
The pumps are tested with water at the manufactur-
er's.
The operating data measured are then documented
in a works test certificate.
If, during a test after repairs, discrepancies compared
with the works certificate are discovered, the following
people can be called in:
1) in-house pump office
2) The manufacturer Richter
or its local agent
The following conveying data can be checked using
the pump performance curves:
Flow rate
Head
Power requirement
NPSHR