START
Ensure gas & electricity
supplies are enabled.
Turn any external timer
to call for heat (if fitted).
Does the Power On
light illuminate?
NO
YES
NO
YES
CHECK: -
1. Operation of any timer or control.
2. External fuses.
3. Supply voltage is 230VAC / 50Hz.
Is there power to the
burner?
CHECK:
-
1. Voltage is correct 230VAC / 50Hz.
2. Internal fuse (if fitted).
3. Integrity of wiring connections.
4. Light.
Does the fan run?
NO
YES
CHECK: -
1. Voltage supply to fan terminals is 230VAC / 50Hz.
2. Vacuum switch is wired correctly (COM / NO).
3. Integrity of wiring connections.
4. Fan, including the free movement of the fan wheel.
Does the amber
light/s illuminate after a
purge period?
NO
Is there power to the
fan?
YES
NO
CHECK: -
1. Integrity of wiring connections.
2. Vacuum switch operation.
3. Ignition controller.
Does the vacuum
switch change over?
YES
NO
CHECK: -
1. Vacuum switch wiring connections.
2. Integrity of wiring connections.
3. Amber light/s.
4. Ignition controller.
5. On DL / HB models check fan does not operate
before burner receives power.
CHECK: -
1. Hose connections to vacuum switch.
2. Vacuum switch operation.
3. Supply voltage is 230VAC / 50Hz.
4. Check vacuum at test point in burner (see table for pressures).
5. Inspect tube joints and couplers for air leaks.
6. Air inlet, outlet, and emitter tubes for obstructions.
7. Seals and gaskets on forced burners.
8. Check turbulator arrangement / lengths.
9. Check correct combustion fan is fitted / HB damper pressure is set.
YES
Do the amber
lights remain
illuminated after 12
seconds?
NO
YES
Does the burner spark?
YES
NO
CHECK: -
1. Spark gap correct 3.0mm + 0.5mm – 0mm (7/64" + 1/64" - 0").
2. Check ignition probes / lead for damage.
3. Vacuum switch closes within 360 seconds.
4. Ignition controller.
CHECK: -
1. Gas supply turned on / purged.
2. Manifold pressure.
3. Supply pressure.
4. Integrity of electrical connections.
5. Integrity of appliance ground connection.
6. Probe lead connected / integrity.
7. Probes clean.
8. Probe position.
9. Hose connection to vacuum switch.
10. Air inlet, outlet, and emitter tubes for obstructions.
Page 2
6.
Fault finding guide
51
Содержание VS15LHE8
Страница 34: ...A Figure 41 Vision Heater Assembly Models VSUTE VSUHE 15kW 76mm 3ins Nom Dia 34...
Страница 35: ...A A Figure 42 Vision Heater Assembly Models VSUTE VSUHE 20 25kW 76mm 3ins Nom Dia 35...
Страница 36: ...Figure 43 Vision Heater Assembly Models VSUTE VSUHE 30 35kW 100mm 4ins Nom Dia 36...
Страница 37: ...Figure 44 Vision Heater Assembly Models VSUTE VSUHE 40kW 100mm 4ins Nom Dia 37...
Страница 38: ...Figure 45 Vision Heater Assembly Models VSUTE VSUHE 45 50kW 100mm 4ins Nom Dia 38...
Страница 39: ...A Figure 46 Vision Heater Assembly Models VSLIE VSLHE VSDLE 15 25kW 8m 76mm 3ins Nom Dia 39...
Страница 40: ...A Figure 47 Vision Heater Assembly Models VSLIE VSLHE VSDLE 20 25kW 10 5m 76mm 3ins Nom Dia 40...
Страница 41: ...Figure 48 Vision Heater Assembly Models VSLIE VSLHE VSDLE 30 35kW 10 5m 100mm 4ins Nom Dia 41...
Страница 42: ...Figure 49 Vision Heater Assembly Models VSLIE VSLHE VSDLE 30 35 40 45 50kW 13 5m 100mm 4in Nom Dia 42...
Страница 43: ...Figure 50 Vision Heater Assy Models VSLIE VSLHE VSDLE 35 40 45 50 kW 16m 100mm 4ins Nom Dia 43...
Страница 59: ...Notes 59...