![Rexroth Indramat BZM 01.3-01-07 Скачать руководство пользователя страница 321](http://html1.mh-extra.com/html/rexroth-indramat/bzm-01-3-01-07/bzm-01-3-01-07_project-planning-manual_1449634321.webp)
t
n
e
m
h
c
a
t
t
A
s
r
e
ll
o
r
t
n
o
C
e
v
i
r
D
3
0
E
V
I
R
D
O
C
E
16-29
16.7 Signal Sequence DKC**.3
Recommended Switching On Sequence
t
SV5076f1.fh7
t1
t2
t3
t4
t5
t6
t7
t8
internal signal
Command values
will take effect
AH is present at
the start signal
DKC**.3 signal sequence with recommended
startup sequence
AH takes effect
internally / for
asynchronous motors
Brake contact
actuated
Control voltage
applied
Bb contact closed
Mains voltage applied
Ud message
RF applied
Motor brake
released
AH takes effect
internally / for
synchronous motors
Fig. 16-38: Recommended switching on sequence
t1: Depends on functions and configuration.
t2: Made up of "Slow operation of mains contactor K1" and "PLC times".
t3: See page 4-55: "Digital outputs (ready, warning and UD-message)".
t4: Apply RF after signal U
D
-Signal.
t5: Internal delay time 8 ms.
t6: 300 ms due to field built up in asynchronous motors, not applicable
to synchronous motors.
t7: Internal delay time due to brake relay:
330 ms with asynchronous
30 ms with synchronous motors
t8: Separation time of brake used, listed in relevant motor project
planning manual.
|
(479) 422-0390
Содержание BZM 01.3-01-07
Страница 343: ......
Страница 344: ...Printed in Germany 2 8 0 1 0 7...