If the remote unit is installed at a lower level than
the chiller, siphons are unnecessary. The
manufacturer guarantees an IP21 rated
protection.
If greater protections are required, the installer
must consider the use of additional guards that do
not limit the exchanging capacity of the
condenser. The connection between the electric
box on the lower compartment of the blast chiller
and the one inside the cabling box must be
present on the remote unit.
8.6. Inspection
The appliance is delivered in conditions such that
it can be started-up by the user.
This functionality is guaranteed by passing the
tests (electric inspection - functional inspection,
appearance inspection) and relative certification
through the specific attachments.
At least the following should be checked after
installation:
Check the electric connections.
Check the functionality and efficiency of
drains.
Check that there are no tools or materials
left in the appliance that could jeopardise
its functionality or even damage the
machine.
Have the appliance perform at least one
complete chill blasting/shock freezing
cycle
2 .. 3%
~ 2 mt
> 0.7 mt
> 0.7 mt
Remote condensing unit
taps.
Inclination towards the
compressor 2-3%
Blast chiller
taps