PART III
IMPORTANT PARTS - POWER SUPPLY AND TRANSFORMER
E-24
ENGLISH
Helpful hints
1. Do not tight up the screws before all the
screws are set.
2. Before install the circuit board put the red
twin check wire under the circuit board.
3. Use magnetic screwdriver.
1. Prepare a new power supply
and 4 screws.
4. Screw the power supply
ground wire connection. Finally,
tight up all the screws on the
circuit board.
5. Plug the red twin check wire
on the power supply circuit
board.
6. Plug the transformer
connection correctly.
7. Connect the red high voltage
and black low voltage wire
connections.
2. Put a screw on the circuit
3. Put the red check wire under
the circuit board before setting a
screw on the circuit board but do
not tight up.
Replace power supply