10 Checklist, part 2 of 2
We recommend that you print out and work through the checklist for commissioning, replacing the
measuring system and when changing the parameterization of a previously accepted system and
store it as part of the overall system documentation.
Documentation reason
Date
Edited
Checked
Sub-item
To note
Can be found under
yes
Present user manual has been
read and understood
–
Document no.:
TR-ECE-BA-GB-0095
Check that the measuring system
can be used for the present
automation task on the basis of
the specified safety requirements
● Safety functions of the fail-safe
processing unit
● Compliance with all technical
data
● Chapter
Safety functions of the fail-
safe processing unit,
Page 14
● Chapter
Requirement for the power supply
● The power supply used must
meet the requirements of
SELV/PELV
(IEC 60364-4-41:2005)
● Chapter
Correct
PROFINET installation
● Observance of the international
standards valid for PROFINET /
PROFIsafe or the directives
specified by the PROFIBUS
User Organization
● Chapter
Installation / Preparation for
Commissioning,
Page 18
● Chapter Commissioning,
page 28
System test after commissioning
and parameter changes
● During commissioning and after
each parameter change all
affected safety functions must
be checked
● Chapter
Preset Adjustment Function
● The preset adjustment function
may only be executed when the
affected axis is stationary
● It must be ensured that the
preset adjustment function
cannot be inadvertently triggered
● After execution of the preset
adjustment function the new
position must be checked before
restarting
● Chapter
Device replacement
● It must be ensured that the new
device corresponds to the
replaced device
● All affected safety functions
must be checked
● Safety Manual
(checklist part 1 of 2)
● Chapter