Commissioning
TR-Electronic GmbH 2012, All Rights Reserved
Printed in the Federal Republic of Germany
Page 32 of 56
TR - ECE - BA - GB - 0095 - 19
05/30/2018
Bus Status, LED2
red
No error
Parameter- or F-Parameter error; 0.5 Hz
No link to the IO-Controller
PORT 1; LED3 = Link, LED4 = Data Activity
LED3, green
Ethernet connection established
LED4, yellow Data transfer TxD/RxD
PORT 2; LED5= Link, LED6 = Data Activity
LED5, green
Ethernet connection established
LED6, yellow Data transfer TxD/RxD
For appropriate measures in case of error, see chapter "Troubleshooting and
Diagnosis Options", page 50.
5.4 Commissioning using the SIEMENS SIMATIC S7 control
Download
● Technical Information:
www.tr-electronic.de/f/TR-ECE-TI-DGB-0233