
50
Side delivery to the left
(in driving direction)
First, the units must be moved together (5). Then choose the
belt direction to the left (1)
Side delivery to the right
(in driving direction)
First, the units must be moved together (5). Then choose the
belt direction to the right (3)
Middle swathing
Divide or bring the working units together as wide or close you
want, to get the desired swath size. (6 or 7)
Then choose the belt direction to the centre (3)
Swath delivery to the left and the right side
Bring the working units together (5)
Choose belt direction outwards. (4)
Central and side delivery to the left
Divide or bring the working units together as wide or close you
want, to get the desired swath size (6 or 7)
Then choose belt direction to the left (1)
Central and side delivery to the right side
Divide or bring the working units together as
wide
or close you want, to get the desired swath
size (6 or 7).
Then choose belt direction to the right (2)
Put the machine into working position
Put the control units, which lower and raise
the working units in floating position.
Crossing swaths with the right working unit
lifted
Put the first control unit on
“pressure” (
+)
Crossing swaths with the left working unit
lifted
Put the second control unit on
“pressure” (+)
Crossing swath with both working units lifted
Put the first and the second control unit on
“pressure” (
+)
1
2
3
4
5
7
6
Содержание Respiro R9 profi
Страница 1: ...Operating manual Respiro R9 profi Version 2 0 2019 original operating manual...
Страница 12: ...8...
Страница 14: ...10 Patented 4 wheel chassis Four sliding plates per working unit provide the ideal ground guide for the pick up...
Страница 16: ...12 Accumulator 1 for rotor suspension parking brake 1 Respiro R9 support foot Tristop brake cylinder 1 1...
Страница 45: ...41 5 6 Key assignment manual operation...