![REITER Respiro R9 profi Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/reiter/respiro-r9-profi/respiro-r9-profi_operating-manual_1435392027.webp)
23
4.2.2.
Coupling of the PTO shaft
Slide the PTO shaft onto the PTO stub shaft. Then secure the
PTO guard to the tractor using the safety chain.
4.2.3.
Connect the hydraulic line and the main
wiring harness
1.
Before connecting the hydraulic lines put all control
units in floating position and stop the tractor so that
the load-sensing connections are depressurised.
2.
Connect double-acting connection 1 to control unit 1.
Pay attention to the correct connection of pressure
and return side.
3.
Connect double-acting connection 2 to control unit 2. Pay attention to the correct
connection of pressure and return side.
4.
Connect the load-sensing hoses to the tractor connections.
5.
Connect the main wiring harness to the drawbar and connect the power supply from the
tractor via the ISOBUS cable and connect the terminal to the main wiring harness.
Load-sensing connections:
Control line: Cat 2
Pressure line: Cat 3
Return: Cat 4
Содержание Respiro R9 profi
Страница 1: ...Operating manual Respiro R9 profi Version 2 0 2019 original operating manual...
Страница 12: ...8...
Страница 14: ...10 Patented 4 wheel chassis Four sliding plates per working unit provide the ideal ground guide for the pick up...
Страница 16: ...12 Accumulator 1 for rotor suspension parking brake 1 Respiro R9 support foot Tristop brake cylinder 1 1...
Страница 45: ...41 5 6 Key assignment manual operation...