40 | City Series CB60E-1
installation
Clearances
Floor to ceiling with top opening
Full framing with vents in front/
2
sides or top
Full framing with low vents in front or
2
sides
Full framing with vents in front or
2
sides
C
I
A1
A
D
L
J
H
L
I
C
D
A1
A
J
G
G
H
H
H
I
C
G
A
A1
G
D
J
L
H
H
I
A
D
C
J
G
G
L
H
H
A
1
opening
opening
opening
opening
Содержание City 686-927
Страница 55: ...City Series CB60E 1 55 installation 2 x 4 shown Max 2 x 6 Typical Installations Flush Install Recessed Install ...
Страница 115: ...City Series CB60E 1 115 notes ...
Страница 120: ...120 City Series CB60E 1 warranty ...
Страница 121: ...City Series CB60E 1 121 notes ...
Страница 122: ...122 City Series CB60E 1 notes ...
Страница 123: ......