DV Stove Horizontal Vent Kit Installation
Review the following sequence of instructions which are typical of most installations. The sequence may vary depending on wall thickness.
Refer to vent location and clearance dimensions in "Exterior Vent Termination Locations" to "DV Stove Horizontal Vent Kit" sections.
Minim
um Installation Height:
U39:
59-3/4" ( 1518mm)
DV Stove Horizontal Vent Kit (# 946-116 & #946-216)
DV Stove Horizontal Vent Kit 2 ft. (Part # 946-116) or 4 ft. (Part # 946-216) includes all the parts needed to install the U39 with minimum horizontal and
vertical vent dimensions. For installations that require longer vertical and/or horizontal vents see the "Dura-vent Termination Kit” and “Component" sections.
Qty. Description
1.
1 Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,
Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm) inside diameter
2.
1 Flex Liner, compressed aluminium 2 ply liner,
4" (102mm) inside diameter
3.
4 spring spacers
4.
1 90 deg. Elbow
5.
1 Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pieces
6.
1 Thimble Cover
7.
1 Wall Thimble (2 pcs.)
8.
1 Adapter
9.
1
AstroCap
Termination Cap
10.
2 Trim Collar
11.
1 tube of Mill-Pac, high temperature sealant
12.
12 Screws, #8 x 1/2" Self tapping, Stainless Steel
13.
13 Screws, #8 x 1/2" Self tapping, Black
14.
4 Screws #8 x 1-1/2" Drill Point, Black
15.
4 Screws #8 x 1-1/2" Drill Point, Stainless Steel
16.
8 Wood screws #8 x 1"
Optional:
946-206 Vinyl Siding Standoff for
AstroCap
1. Set the unit in its desired location. Check
to determine if wall studs will be in the way
of the venting system, adjust location until
all clearances are met and there are no
obstructions.
Note: A 1-1/2"(38mm) clearance around the
outer pipe must be maintained except
that only a 1" (25mm) clearance is
needed at the termination end.
IMPORTANT:
Do not locate termination hood where excessive
snow or ice build up may occur. Be sure to
check vent termination area after snow falls,
and clear to prevent accidental blockage of
venting system. When using snow blowers,
make sure snow is not directed towards vent
termination area.
2. Assemble a
trial fit
to determine the vertical
center-line for the vent termination.
a) Cut a 9-1/2" x 9-1/2" (241mm x 241 mm) square
hole on both the interior and exterior wall.
b) Install wall thimbles on both interior and exterior
wall with 4 wood screws (#8 x 1") per thimble.
c) Attach the 2 piece adjustable pipe section to
the vent terminal and slide into position from
the exterior. The larger diameter end of the
adjustable pipe goes to the vent terminal.
d) Install the 90o elbow onto the adjustable pipe to
determine the vertical centerline of the starter
collar on the unit.
Note:
if the centerline cannot be met, the adjustable
sections will have to be cut.
e) Cut the 2 ft. or 4 ft. section of rigid pipe to length.
Ensure that the pipe length when cut will seat
onto both the starter collar and the 90o elbow.
Crimped section of rigid pipe seats into the
90o elbow. Only cut the uncrimped side of pipe.
Note:
a) Liner sections should be continuous without any joints or
seams.
b) This is an approved system, therefore components in this
system must not be substituted for any other manufacturer's
products.
Содержание U39-NG12
Страница 53: ...Regency U39 12 ULTIMATE Freestanding Gas Stove 53 notes...
Страница 58: ......
Страница 59: ......