RDL-2000
Installation Guidelines
70-00144-01-01
Proprietary Redline Communications © 2011
Page
36
of 52
March 9, 2011
Table 10
:
Outdoor Line Protection Wiring Diagram
Terminal Block (TB)
Signal
Color Code
Wire Color
1
Rx +
White / Orange
2
Rx -
Orange
3
Tx +
White / Green
4
Tx -
Green
5
48 (+)
Blue
6
48 (+)
White/Blue
7
48 (-)
White/Brown
8
48 (-)
Brown
Line Protector Mast Mounting Kit
This kit is used for mounting the lightning protector to a 76 - 127 mm (3-5 in) diameter pole.
Note: The Polyphaser IX-Pole-Kit kit is not available directly from Redline, and must be
ordered separately (if required) from a telecom equipment distributor.
1. Align box cover plate (1) mounting holes (Pemstuds facing out) with mounting holes on the
LP box.
2. Insert screws (2) through the LP box and cover (1), secure with #8 washer (5) and nut (4).
3. Attach bracket (3) onto Pemstuds of assembly cover (1) using #10 washer (7) and nut (6).
4. Slide hose clamp (8) through both slotted grooves of bracket (3), attach hose clamp to pole.
Figure 24: Lightning Protection - Mounting Kit
Table 11
:
Lightning Protection - Mounting Kit Parts List
Item Description
Qty.
Item Description
Qty.
1
Assm Bracket
1
5
Washer #8 int.
2
2
Screw 8-32 x 0.5
2
6
Nut #10
2
3
Bracket Mnl Dbl Bend
1
7
Washer #10
2
4
Nut #8
2
8
Clamp Hose 3-5 in.
1
4Gon www.4Gon.co.uk [email protected] Tel: +44 (0)1245 808295 Fax: +44 (0)1245 808299