PELLET STOVES
Chapter 3
red
INSTALLATION AND USE MANUAL
page
19
Installation and assembly
Technical service - Rights reserved - Reproduction prohibited
3.2.
PREPARATION AND UNPACK ING
The DALIA OYSTER stove
is delivered in one sole package formed
of:
o
Structure packaging
o
Side and top packaging (Fig.1)
Open the packaging, remove the four screws that secure the base of
the stove to the pallet, two to the right and two to the left (see figure
4), and position the stove in the selected place, ensuring that it is
complies with the above instructions.
The stove body or unit must always be kept in a vertical position when
moved, and moved only using carts. Special care must be used to
protect the door and the glass from impacts that would damage them.
Moving the product must always be done with care. If possible, unpack
the stove in the area where it is going to be installed.
The materials which make up the packaging are not toxic or harmful,
so no special procedures for disposal by required.
Their storage, disposal or possible recycling are therefore the responsibility
of the final user, in compliance with current legislation on the subject.
Do not store the stove unit or its cladding without their packaging.
Position the stove without its cladding and connect it to the flue pipe.
Use the four adjustable feet
(J)
to get the stove correctly levelled so
that the smoke outlet
(S)
is lined up with the connecting pipe
(H)
.
Once the operations for connection are complete, assemble the
cladding (ceramics or steel sides).
If the stove needs to be connected to a discharge pipe which goes
through the rear wall (to connect up with the flue), take the greatest
care to make sure that the joint is not stressed.
Figure 4
- Removing packaging screws
Figure 2
– Example of stove + steel
sides and top packaging – Dalia stove
Содержание Dalia Oyster
Страница 1: ...8901168900 USE AND MAINTENANCE MANUAL EN...