28
O
P
28
7-TROLLEY ASSEMBLY
Take out the trolley from package 2 and proceed as follows:
• move the trolley towards the boiler and make sure the feed screw goes inside the trolley’s hole “P”
• now lock it into place with the two side levers (see image below)
Note: cap “O” is used during transport to keep in the ash!