![RaycoWylie i4500 Скачать руководство пользователя страница 16](http://html2.mh-extra.com/html/raycowylie/i4500/i4500_calibration-instructions-manual_3893260016.webp)
55M4500CCE00 REV A
CH2 (height outrigger)
–
vertical distance between the boom pivot pin and the
ground when on outriggers.
NR (number of rams)
–
number of boom lift cylinders, normally 1 or 2.
RD (rod diameter)
–
rod diameter of the lift cylinder.
BD (bore diameter)
–
bore diameter of the lift cylinder.
CR2M (m.h. radius)
–
radius of the main hoist drum from the center to the middle of
the hoist line layers.
CL5M (p2mhh)
– horizontal distance between the center of main hoist drum and the
boom foot pin. If the drum is mounted on the boom, this dimension is zero.
CL6M (p2mhv)
– vertical distance between the center of main hoist drum and boom
foot pin. If the drum is mounted on the boom, this dimension is zero.
CR22M
– radius of the boom base mounted main hoist guide sheave,
*see note 1
.
CL28M
– vertical distance between the boom base mounted main hoist guide sheave
and the boom foot pin measured when the boom is horizontal.
*see note 1
.
CL29M
– horizontal distance between the boom base mounted, main hoist guide
sheave and the boom foot pin measured when the boom is horizontal.
*see note 1
.
CR2A (a.h. radius)
– radius of the auxiliary hoist drum from the center to the middle
of the hoist line layers.
CL5A (p2ahh)
– horizontal distance between the center of the auxiliary hoist drum
and the boom pivot pin. If the drum is mounted on the boom, this dimension is zero.
CL6A (p2ahv)
– vertical distance between center of auxiliary hoist drum and boom
pivot pin. If the drum is mounted on the boom, this dimension is zero.
CR22A
– radius of the boom base mounted, auxiliary hoist guide sheave,
*see note 1
.
CL28A
– vertical distance between the boom base mounted, auxiliary hoist guide
sheave and the boom foot pin measured when the boom is horizontal.
*see note 1
.
CL29A
– the horizontal distance between the boom base mounted, auxiliary hoist
guide sheave and the boom foot pin measured when the boom is horizontal.
*see
note 1
.
*Note 1: This option is rare and these values are generally set to zero. If a guide
sheave is fitted but mounted on the superstructure (not the boom) then the sheave is
treated as though it is the winch drum (see sketches).
Содержание i4500
Страница 2: ...55M4500CCE00 REV A...