Operation QUANTRON-K2
21
4
4
Operation QUANTRON-K2
4.1
Switching on the control unit
Prerequisites:
The control unit is connected correctly to the winter service spreader and the
tractor (for an example, see chapter
3.3: Connecting the control unit,
).
A minimum voltage of
11 V
is guaranteed.
n
CAUTION
Risk of injury due to ejected spreading material
In the event of a fault, the metering slide may open unexpectedly
when driving to the spreading location. There is a danger of slip-
ping and injury to persons due to ejected spreading material.
Before driving to the spreading location,
be sure to
always switch off the electronic control unit QUANTRON-K2.
NOTICE
The operating manual describes the functions of the control unit
QUANTRON-K2
from software version 2.00.00
.
Содержание QUANTRON-K2
Страница 6: ...Table of Contents IV...
Страница 10: ...User notices 1 4...
Страница 26: ...Attachment and installation 3 20...
Страница 72: ...Operation QUANTRON K2 4 66...
Страница 90: ...Spreading operation using the QUANTRON K2 Control unit 5 84...
Страница 94: ...Alarm messages and possible causes 6 88...
Страница 96: ...Special equipment options 7 90...
Страница 100: ...Index D...
Страница 102: ......