Operation AERO GT ISOBUS
43
4
4.7.2
Retract the boom
1.
Press the
Lock
function key
for at least 3 seconds
.
The
Fold in main sections
symbol appears on the menu screen.
The pendulum frame lock is
locked
.
2.
Press the
Fold in end sections
function key so until the boom end sections
are fully folded in both sides.
3.
Press the
Fold in main sections
function key until the boom initial sections
and boom centre sections are completely folded in.
4.
Press the
Lower boom
function key for at least 5 seconds:
The boom lies on the storage places on the side of the hopper.
The transport locks are closed.
n
WARNING
Risk of injury when extending and retracting the boom
The booms can injure people and cause material damage when
extending and retracting. In particular, make sure that the booms
also take up space behind the machine.
Operate the boom only if there is sufficient free space
around the spreader.
Only extend or retract the booms when the boom mineral
fertiliser spreader is attached.
Make sure everybody leaves the danger zone.
NOTICE
Take a look at the boom to check that the boom end sections are completely
folded in.
NOTICE
Take a look at the boom to check that the boom initial sections and centre
sections are fully folded in.
Содержание AERO GT ISOBUS
Страница 8: ...User instructions 1 4 ...
Страница 20: ...Layout and function 2 16 ...
Страница 24: ...Attachment and installation 3 20 ...
Страница 58: ...Operation AERO GT ISOBUS 4 54 ...
Страница 63: ...Optional equipment 59 7 7 Optional equipment Illustration Designation Level sensors Joystick ...
Страница 64: ...Optional equipment 7 60 ...
Страница 66: ......