Attachment and installation
17
3
3
Attachment and installation
3.1
Tractor requirements
Before attaching the machine control unit, check that your tractor meets the fol-
lowing requirements:
A minimum voltage of
11 V
must be guaranteed
at all times
, even when
several consumers are connected at the same time (e.g. air conditioning,
lights).
Oil supply:
max. 210 bar
, single or double-acting valve (depending on the
equipment),
The PTO speed must be at least
540 rpm
and must be observed (basic
requirement for a correct working width).
9-pin socket (ISO 11783) at the rear of the tractor for connecting the machine
control unit to the ISOBUS,
9-pin terminal connector (ISO 11783) for connecting an ISOBUS terminal to
the ISOBUS.
3.2
Connections, sockets
3.2.1
Power supply
The machine control unit is powered via the 9-pin socket on the rear of the tractor.
NOTICE
For tractors without power shift transmissions, the forward speed must be
selected by the right gear ratio so that it corresponds to a PTO speed of
540 rpm
.
NOTICE
If the tractor does not have a 9-pin socket at the rear, a tractor installation kit with
9-pin socket for the tractor (ISO 11783) and a forward speed sensor can be
purchased as optional equipment.
Содержание AERO GT ISOBUS
Страница 8: ...User instructions 1 4 ...
Страница 20: ...Layout and function 2 16 ...
Страница 24: ...Attachment and installation 3 20 ...
Страница 58: ...Operation AERO GT ISOBUS 4 54 ...
Страница 63: ...Optional equipment 59 7 7 Optional equipment Illustration Designation Level sensors Joystick ...
Страница 64: ...Optional equipment 7 60 ...
Страница 66: ......