Operation AERO GT ISOBUS
4
30
6.
Press
OK
.
The new value is saved in the control unit.
The display changes to page 3.
The metering roller now fills the spreading trough and automatically stops
after
15 s
.
The display changes to page 4.
7.
Empty the fertiliser collection container and then put it back under the
metering device.
8.
Press
OK
.
The display changes to page 5.
The calibration process now runs automatically until the metering unit
switches off automatically after
80 s
.
Figure 4.6:
Menu calibration test and input window (example)
[1] Number of turns of the metering roller
[2] Time remaining until the end of the calibration test
n
WARNING
Risk of injury during the calibration test
Rotating machine parts and escaping fertiliser can lead to injuries.
Before starting
the calibration test, make sure all require-
ments are met.
Observe the
Calibration test
chapter in the operating
manual of the machine.
1
2
Содержание AERO GT ISOBUS
Страница 8: ...User instructions 1 4 ...
Страница 20: ...Layout and function 2 16 ...
Страница 24: ...Attachment and installation 3 20 ...
Страница 58: ...Operation AERO GT ISOBUS 4 54 ...
Страница 63: ...Optional equipment 59 7 7 Optional equipment Illustration Designation Level sensors Joystick ...
Страница 64: ...Optional equipment 7 60 ...
Страница 66: ......