10 | iProductionManager
62 / 112
Operating instructions
3. Assign a name.
4. To confirm the action, press the button:
>>
The planning is displayed in the planning list.
10.7.2
Start planning
a
a
The iProductionManager is not currently processing any tickets. When tickets are processed, a message
appears, informing you that all tickets must be cancelled before planning starts.
1. Press the button
2. Press the desired planning.
>>
The planning starts immediately. The tickets are placed on the racks according to the planning. The tickets on
the ticket board are replaced by the tickets included in the planning.
Содержание iCombi Pro Series
Страница 1: ...iCombi Pro Operating instructions...
Страница 2: ......
Страница 110: ......
Страница 111: ......