Maintenance
2U Enclosures
SpycerNode
100
User Manual | 2902.3266.02 - 08
Replacing a Power Cooling Module
The power cooling module is hot-swappable.
Removing a Power Cooling Module
Perform the following steps:
1.
Ensure that you identify the faulty power cooling module correctly.
2.
Switch off and disconnect the power supply cord.
Danger of electric shock inside
In the power supply components be located
directly on the mains voltage. Even after discon-
nection touching can be fatal.
Do not remove covers from the power cooling
module. Return the module to your supplier
for repair.
Overheating damage
Operation of the enclosure with any modules missing will
disrupt the airflow and the drives will not receive sufficient
cooling.
It is essential that all apertures are filled before oper-
ating the enclosure system.
System Damage
Prior to removing the power cooling module, disconnect the
power from the power cooling module, by either the mains
switch (where present) or by physically removing the power
source in order to ensure that your system has warning of
an imminent power shutdown.
A faulty power cooling module must be replaced by a
fully operational power cooling module within 24 hours.
Содержание SpycerNode 2U12
Страница 1: ...R S SpycerNode User Manual 2902 3266 02 08...
Страница 6: ...SpycerNode 6 User Manual 2902 3266 02 08...
Страница 82: ...Configuration Installing the Spectrum Scale Client SpycerNode 82 User Manual 2902 3266 02 08...
Страница 86: ...Operation Using the R S Device Manger SpycerNode 86 User Manual 2902 3266 02 08...
Страница 128: ...Working with the R S Installer RSI RSI Troubleshooting SpycerNode 128 User Manual 2902 3266 02 08...
Страница 132: ...Transport Packing the System SpycerNode 132 User Manual 2902 3266 02 08 5U Enclosures...
Страница 136: ...Index SpycerNode 136 User Manual 2902 3266 02 08...