Maintenance
5U Enclosures
SpycerNode
120
User Manual | 2902.3266.02 - 08
Installing a Power Supply Unit
Perform the following steps:
1.
Rotate the power supply unit so that the red release latch and handle are
on the left-hand side.
2.
Slide the power supply unit into its slot until the latch clicks home. The
enclosure will automatically detect the new unit.
Overheating damage
An incorrect airflow can damage components.
The power supply unit module bay must not be empty
for more than two minutes while the enclosure is
powered.
Содержание SpycerNode 2U12
Страница 1: ...R S SpycerNode User Manual 2902 3266 02 08...
Страница 6: ...SpycerNode 6 User Manual 2902 3266 02 08...
Страница 82: ...Configuration Installing the Spectrum Scale Client SpycerNode 82 User Manual 2902 3266 02 08...
Страница 86: ...Operation Using the R S Device Manger SpycerNode 86 User Manual 2902 3266 02 08...
Страница 128: ...Working with the R S Installer RSI RSI Troubleshooting SpycerNode 128 User Manual 2902 3266 02 08...
Страница 132: ...Transport Packing the System SpycerNode 132 User Manual 2902 3266 02 08 5U Enclosures...
Страница 136: ...Index SpycerNode 136 User Manual 2902 3266 02 08...