![Rae MeshGuard Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/rae/meshguard/meshguard_user-manual_3371632025.webp)
MeshGuard User’s Guide
Note:
To stop zero calibration before the countdown reaches 0, press any
key. The LCD displays “no” and advances to the next programming
menu, Span calibration.
5.3.5 Span Calibration
“CAL” and “go” flash in alternation, and “SPAn” is shown. The
MeshGuard is now ready to perform a span calibration.
To start calibration, press [Y/+]. The LCD displays “go.”
The MeshGuard waits for 10 seconds so that you have time to connect
the span gas. Connect the calibration gas adapter to the MeshGuard, and
connect the gas cylinder to the adapter. Start the flow of gas.
24