FinM
Deployment
Guide
Release
4.5.10
2
‐
6
TBS
Mounting
Site
Installation
TBS
Mounting
on
a
vertical
pole
All
sizes
1. Fasten
the
standoffs
to
the
base
plate
in
the
holes
labeled
“V”
as
shown:
Figure
2
‐
3:
Fasten
standoffs
to
base
plate
(for
vertical
pole)
2. Place
the
TBS
as
shown
over
the
standoffs,
and
using
the
Allen
screws
and
washers,
fasten
the
TBS
to
the
base
plate.
Figure
2
‐
4:
Fasten
TBS
to
base
plate
(for
vertical
pole)
Vertical
Pole
‐
thin
1. Diameter
3/4
to
1
1/2:
Before
raising
the
TBS
on
the
pole,
position
the
pole
clamp
as
shown
in
the
following
two
figures.
Do
not
completely
tighten
the
bolts:
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...