FinM
Deployment
Guide
Release
4.5.10
2
‐
12
TBS
Mounting
Site
Installation
2. Place
this
assembly
on
the
pole
where
you
want
to
mount
the
TBS.
Once
it
is
in
place,
rotate
the
pole
clamp
as
shown,
then
tighten
both
bolts.
Horizontal
Pole
‐
medium
1. Diameter
2
to
3:
Before
raising
the
TBS
on
the
pole,
position
the
pole
clamp
as
shown
in
the
following
two
figures.
Do
not
completely
tighten
the
bolts:
Figure
2
‐
20:
Thin
pole:
Rotate
clamp
Figure
2
‐
21:
Thin
pole:
tighten
bolts
Figure
2
‐
22:
Medium
pole:
Fasten
clamp
to
base
plate
Figure
2
‐
23:
Medium
pole:
Do
not
com
‐
pletely
tighten
bolts
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...