FinM
Deployment
Guide
Release
4.5.10
3
‐
12
Intra
Train
Handover
(ITHO)
Update
Message
Network
Guidelines
Figure
3
‐
8:
IBHO
‐
Part
3
3.10
Intra
Train
Handover
(ITHO)
Update
Message
Parallel
to
the
Inter
Base
Handover
(IBHO)
process,
described
above,
Fiber
in
Motion
also
supports
an
Intra
Train
Handover.
The
ITHO
feature,
implemented
in
the
TMUs,
enables
extended
coverage
and
throughput.
As
mentioned
above
(see
Train
Side
(On
‐
board)
Network
on
page
2
‐
3
)
this
mode
requires
2
on
‐
board
TMUs
(ideally
at
each
end
of
the
train),
with
L2
connectivity
between
them.
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...