FinM
Deployment
Guide
Release
4.5.10
2
‐
44
TMU
Mounting
Site
Installation
Figure
2
‐
74:
Inserting
the
drawer:
Release
locking
levers
11.Insert
the
other
4
cage
nuts
in
the
appropriate
holes
in
the
front
side
of
the
vertical
rails.
12.Using
the
other
4
Philips
screws
with
the
black
washers,
secure
the
drawer
to
the
front
side
of
the
vertical
rails
of
the
rack.
Figure
2
‐
75:
Secure
drawer
to
the
front
side
of
rack
Press
locking
levers
and
push
drawer
in
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...