12
SFK 55 - RAD - ING - Manual - 1512.2_CSA_TTS
1. INSTALLATION
INST
ALLER
1.1.6. POSITIONING AND CLEARANCES TO COMBUSTIBLE MATERIAL AND
SERVICE CLEARANCES
The water heaters must be installed only on a
vertical solid wall, able to sustain its weight.
This water heaters has been certified to be installed
with “0” clearances to combustible material.
In order to allow the access inside the water
heaters for maintenance operations, follow the
minimum service clearances indicated in figure 4.
To facilitate the installation, the water heater is
provided with a jig that allows setting in advance
the connections to the tubes providing the ablility
of connecting the water heaters to completed
masonry structure.
1.1.7. ATTACHING THE WATER HEATERS TO WALL
To position the unit, proceed as follows:
1. Trace a line using a spirit level (min. length 25 cm / 10”) on the installation wall (fig. A).
2. Mark the two points to insert the two screws (fig. B) and drill the wall (fig. C).
3. Fix the wall bracket using the screws (fig. D) provided. Hang the water heater using the attached holes (E-F).
H
B
A
Y
X
15.98"
(406mm)
15.98"
(406mm)
HOLES
FIXING
INSTALLATION
A - 7.8 inch
B - 11.8 inch
X - 2.3 inch
Y - 2.3 inch
H - 36 inch
fig. 4
fig. F
fig. A
fig. B
fig. C
fig. D
fig. E
Содержание SFK 55
Страница 6: ......
Страница 32: ......
Страница 61: ...61 SFK 55 RAD ING Manual 1512 2_CSA_TTS 3 USE USER ...
Страница 62: ...62 SFK 55 RAD ING Manual 1512 2_CSA_TTS 3 USE USER ...
Страница 63: ...63 SFK 55 RAD ING Manual 1512 2_CSA_TTS 3 USE USER ...
Страница 64: ...64 SFK 55 RAD ING Manual 1512 2_CSA_TTS 3 USE USER ...
Страница 73: ......
Страница 74: ......
Страница 75: ......