DUCOT – Heavy Attack 2020
Rural Fire Brigades Association Queensland
Revision 1.0, 11/2020 Page 3 of 132
13.1.6
Siren Controller and PA ........................................................................................ 44
13.1.7
Cabin Switches .................................................................................................... 45
13.1.8
Radios .................................................................................................................. 46
13.1.9
Cabin Electrical Panel .......................................................................................... 48
13.1.10
Portable Radio Holders ........................................................................................ 51
13.1.11
Torches ................................................................................................................ 51
13.2 Pump Set ........................................................................................................................ 52
13.2.1
Pump Set Batteries .............................................................................................. 52
13.2.2
Primer .................................................................................................................. 53
13.2.3
Pump Control Panel ............................................................................................. 53
13.2.4
Pump Control Panel Internal ................................................................................ 55
13.2.5
Hatz 4H50TI-OPU Diesel Motor ........................................................................... 58
13.2.6
Starting the Engine ............................................................................................... 59
13.2.7
Stopping the Engine ............................................................................................. 59
13.3 Plumbing ......................................................................................................................... 60
13.3.1
Water Source ....................................................................................................... 61
13.3.2
Onboard Water Tank ............................................................................................ 61
13.3.3
Drafting Water ...................................................................................................... 61
13.3.4
Hydrant Fill ........................................................................................................... 62
13.3.5
Water Delivery ...................................................................................................... 63
13.3.6
Hose Reels .......................................................................................................... 65
13.3.7
Electrical Rewinding the Hose Reel: ..................................................................... 66
13.3.8
Manually Rewinding the Hose Reel ...................................................................... 67
13.4 Foam .............................................................................................................................. 68
13.5 Air Compressor ............................................................................................................... 69
13.6 Compressed Air Foam System (CAFS) .......................................................................... 70
13.7 Water Tank ..................................................................................................................... 72
13.7.1
Water Level Management .................................................................................... 73
13.7.2
Filling the Tank ..................................................................................................... 74
13.7.3
Draining the Tank ................................................................................................. 74
13.8 Lockers ........................................................................................................................... 75
13.8.1
Locker Doors ........................................................................................................ 75
13.8.2
Near Side Front Locker ........................................................................................ 76
13.8.3
Near Side Front Under Tray Locker ...................................................................... 77
13.8.4
Near Side Mid Locker ........................................................................................... 78
Содержание RFBAQ Isuzu FTS 139-260
Страница 110: ...DUCOT Heavy Attack 2020 Rural Fire Brigades Association Queensland Revision 1 0 11 2020 Page 110 of 132 ...
Страница 112: ...DUCOT Heavy Attack 2020 Rural Fire Brigades Association Queensland Revision 1 0 11 2020 Page 112 of 132 ...
Страница 114: ...DUCOT Heavy Attack 2020 Rural Fire Brigades Association Queensland Revision 1 0 11 2020 Page 114 of 132 ...