Installation notes
4HD/5HD-HUB units operate on a standard network, made of standard network cables and one or more
network switches.
4HD/5HD-HUB units are connected through a main scoring network switch that links all the 4HD/5HD-HUB
units, MMS digital, TCS and Q-COM sub-networks together with the second network card of the Conqueror
Server.
QubicaAMF supplies scoring network switches with 8 ports. One additional network switch will be supplied
for TCS or MMS Digital kits. QubicaAMF also supplies the network cables needed for the installation. Each
cable’s length is dimensioned according to the distance between each
4HD/5HD-HUB unit and the main (or
slave) scoring network switch (refer to Table
The connection between the main scoring network switch with the Front Desk, between the main scoring
network switch with the MMS digital, the TCS and the Q-COM network switches and the single channel video
server operates on a Cat.5e solid network cable that must not exceed 300 feet
–
100 m supplied by
QubicaAMF.
for the connection for the Cat. 5e wall mounting boxes.
When a custom length patch cable is needed, make it by following the instructions in Table
For a correct installation, the network must be balanced. This means that between each 4HD/5HD-HUB unit
and the Conqueror server, there will always be the same number of switches divided into homogenous
groups.
Install each scoring network switch in the middle of the lanes area that it serves.
For an easier troubleshooting process, fix each network switch with the port side facing downward in a
manner that is easily accessible, and connect each 4HD/5HD-HUB to its scoring network switch while
respecting the correct port numbering.
QubicaAMF recommends the installation of a cable conduit along the whole length of the curtain wall, to
accommodate the network and the audio/video cables.
Example: In a 60-lane installation, a total of six network switches will be supplied (one used as main and five
as slaves, where each slave will serve a group composed of twelve lanes):
•
fix the main scoring network switch between lanes 30 and 31;
•
fix the first slave scoring network switch between lanes 6 and 7, the second between lanes 18 and
19, the third between lanes 30 and 31, and so on;
•
connect the first 4HD/5HD-HUB of each group to port number 1 of its slave scoring network switch,
the second to port 2, the third to port 3, and so on.
•
Connect the first slave scoring network switch to port 1 of the main scoring network switch, the
second to port 2 of the main scoring network switch, the third to port 3 of the main scoring network
switch, and so on.
Continue reading this manual for further information.
Содержание 400288005
Страница 1: ...P N 400288005 REV L 09 21...
Страница 24: ...Electrical specifications BES X installation manual 14 P N 400288005 Rev L 09 21...
Страница 94: ...Front Desk BES X installation manual 84 P N 400288005 Rev L 09 21...
Страница 114: ...System first start up BES X installation manual 104 P N 400288005 Rev L 09 21...
Страница 141: ...BES X installation manual Parts P N 400288005 Rev L 09 21 131...