System components
BES X installation manual
6
P/N: 400288005; Rev: L, 09/21
1.2
4HD-CPU and 5HD-CPU
IMPORTANT: the 5HD-CPU unit, P/N: 288250023, is supported by Conqueror Pro version 12 or higher.
The 4HD-CPU and 5HD-CPU are the graphic engine of the BES X scoring system. Their functionality is to display
the scoring grids, the animations, the different environments, etc. They are connected to the 4HD/5HD-HUB
unit with a single network cable and must be installed near the overhead monitors.
These units can manage up to two independent video outputs for the scoring system, but they can control
(monitor ON/OFF, channel change, etc. only on supported monitors) on up to three monitors (two for the
scoring system and one with an independent video signal). They communicate and take power from the
4HD/5HD-HUB unit through the network cable connected to the L1 connector and are connected to the
overhead monitors through the HDMI connectors. These units must be installed near the overhead monitors:
in particular, the 4HD-CPU and the 5HD-CPU must be installed on the monitor frames if the monitor frames
are supplied by QubicaAMF. If the monitor frames are not supplied by QubicaAMF, the 4HD-CPU or the 5HD-
CPU unit must be fixed to a vertical surface
NEAR
the overhead monitors, in an area that ensures correct air
circulation around the unit, with the L1 connector facing upwards.
There are two versions for the 4HD-CPU unit with part numbers: 288250017 and 288250020. In this manual,
we will use “4HD
-
CPU” as shorthand to refer to the two 4HD
-CPU versions for simplicity. We will use the
4HD-CPU version only when it is necessary to discuss the characteristics or properties of a specific version.
There is one version of the 5HD-CPU unit with part number: 288250023.
1.2.1
Installation notes
The 4HD/5HD-CPU unit communicates with the 4HD/5HD-HUB via a standard POE network. The connection
between the 4HD/5HD-CPU and the 4HD/5HD-HUB is between the L1 port of the 4HD/5HD-CPU unit and the
L1 port of the 4HD/5HD-HUB, as explained in this manual.
In the case of monitors and monitor frames provided by QubicaAMF, the 4HD/5HD-CPU unit must be installed
on the monitor frames. If the monitor frames are not supplied by QubicaAMF, the 4HD/5HD-CPU unit must
be fixed to a vertical surface NEAR the overhead monitors, in an area that ensures correct air circulation
around the unit, with the L1 connector facing upwards.
The connection between the 4HD/5HD-HUB and the 4HD/5HD-CPU is made with a different cable, depending
on the distance between the units:
•
Up to 50 m (up to 150 ft.): one AWG-24 Cat. 5e network cable;
•
More than 50 m (more than 150 ft.) and up to 100 m (up to 330 ft.): one solid AWG-23 Cat. 6 cable
(P/N: 288401038).
These cables are provided by QubicaAMF.
Содержание 400288005
Страница 1: ...P N 400288005 REV L 09 21...
Страница 24: ...Electrical specifications BES X installation manual 14 P N 400288005 Rev L 09 21...
Страница 94: ...Front Desk BES X installation manual 84 P N 400288005 Rev L 09 21...
Страница 114: ...System first start up BES X installation manual 104 P N 400288005 Rev L 09 21...
Страница 141: ...BES X installation manual Parts P N 400288005 Rev L 09 21 131...