Introduction
c. Lay down the Full Rack, Load Position between the right parking module and the module to its
left.
Training Note
: If the library was unpacked according to the Scalar i6000 Unpacking and Pallet
Removal Instructions document, the right X-Axis half racks have been removed, but the left
parking module half racks are still installed. You may be able to install the next full rack to the
right by snapping it down on the installed half rack. Sometimes, however, the racks won't snap
together right over left. When this happens, just loosen or remove the left half rack and snap the
racks into place left over right.
d. The Half Rack, End Position gear racks are already installed in the right parking module, unless
you are adding additional modules onto an existing system. In that case, you need to install the
lay down the Half Rack, End Position gear rack now.
e. Make sure that all racks are snapped together and lie flat against the rack support.
f.
Screw B screws and T-nuts should be pre-assembled. If they are not, install a T-nut on each
screw in the Screw B bag. Make sure the wider end of the T-nut faces toward the screw head.
g. Use a 2.5 mm hex wrench to install the Screw B’s in all the gear racks, starting with the left-
most location. The screws go through the slots in the gear rack tabs and into the raised,
threaded screw holes in the rack supports (see
Figure 6
). Use three screws with T-nuts for half
racks and four screws
with T-nuts for full racks.
M4X6
screw
M4 T-nut
Screw B
Содержание Scalar i6000
Страница 14: ...14 Introduction Figure 1 Power Rail Position in Module Two bridge clamps connect adjacent rails...
Страница 15: ...Scalar i6000 Installation Guide Super Doc 15 Figure 2 Power Rail Front 4 pin and 3 pin connectors...
Страница 23: ...Scalar i6000 Installation Guide Super Doc 23 Figure 6 Installing Bottom and Middle Racks...
Страница 24: ...24 Introduction Figure 7 Middle X Axis Gear Rack...