9.1 Preparing to Power on the Library
9-2
501801 Rev. 07-01-19
5.
From the back of the library, check the following:
– A tape drive or drive filler assembly is installed in every drive bay position.
– An adequate number of power supplies are installed for the number of
installed drive bays and an attached MEM. See the
XLS Library Product
Specification
.
– The input power source is adequate to support the number of installed drive
bays and an attached MEM.
6.
If a MEM is attached to the LRM, confirm the following:
– The carousel locks have been released. See
.
– The MEM cable from the LRM is securely connected to one of the two
connectors on the MEM’s carousel controller. See
.
7.
Close any open doors.
8.
Confirm that the I/O ports are closed.
CAUTION
To avoid tripping the circuit breaker (either at the library or at the
main circuit panel), ensure the input power is adequate to support the
library’s configuration.
Содержание XLS-810160
Страница 1: ...XLS 810160 XLS 810240 Tape Libraries Installation Manual Document No 501801 Rev 07 01 19...
Страница 8: ...Table of Contents viii 501801 Rev 07 01 19...
Страница 32: ...1 6 For More Information 1 24 501801 Rev 07 01 19...
Страница 78: ...6 5 Installing the Rear Side Panel 6 12 501801 Rev 07 01 19 Notes...
Страница 100: ...8 2 Connecting the Cables 8 8 501801 Rev 07 01 19 Notes...
Страница 114: ...9 3 Logging Into X Link 9 14 501801 Rev 07 01 19 Notes...
Страница 154: ...10 6 Defining Other Library Settings and Policies 10 40 501801 Rev 07 01 19 Notes...
Страница 168: ...11 3 Viewing the Inventory Report 11 14 501801 Rev 07 01 19 Notes...
Страница 182: ...13 3 Scanning the Inventory and Locking the Doors 13 8 501801 Rev 07 01 19 Notes...
Страница 198: ...A 3 Addresses for the Media Expansion Module MEM A 8 501801 Rev 07 01 19 Notes...
Страница 208: ...Index IN 6 501801 Rev 07 01 19...