
82
JUN 2020
USER GUIDE
5
OPERATOR INSTRUCTIONS
DS-200iQ / DS-600iQ
REV 00
5.3
RUNNING A JOB
1. To begin running a job, select the required job from the jobs list in the Jobs
Screen and press ‘
Accept
’ as shown in Figure 5.48.
QTL-RND-SCR-00000101-A-00
Figure 5.48 – Selecting a job to run from the jobs list
2. Load the machine with the correct stationery required for the selected job.
Ensure settings and adjustments to the machine units have been
made according to the job requirement prior to running the job,
for further assistance.
5.3.1
SINGLE CYCLE 1 X PROCEDURE
Before running a full job, it is advisable to run a single cycle (1x procedure), to establish
whether the tested mailset runs smoothly.
Press the ‘
1x
’ button in the Run Screen as shown in Figure 5.49 to perform a single cycle
and begin testing the mailset.
QTL-RND-SCR-00000102-A-00
Figure 5.49 – Running a single cycle 1x procedure
Adjustment options for testing the mailset will become available once the single cycle
has been initiated, see section
Содержание DS-200iQ
Страница 1: ...USER GUIDE DS 200iQ DS 600iQ...
Страница 7: ...1 USER GUIDE DS 200iQ DS 600iQ 1 SAFETY STANDARDS COMPLIANCE...
Страница 11: ...5 USER GUIDE DS 200iQ DS 600iQ 2 INTRODUCTION...
Страница 16: ...10 USER GUIDE DS 200iQ DS 600iQ 3 INTEGRATED MAIL OPERATING SYSTEM IMOS...
Страница 41: ...35 USER GUIDE DS 200iQ DS 600iQ 4 OPERATOR IMOS SETTINGS...
Страница 62: ...56 USER GUIDE DS 200iQ DS 600iQ 5 OPERATOR INSTRUCTIONS...
Страница 92: ...86 USER GUIDE DS 200iQ DS 600iQ 6 OPERATOR MAINTENANCE...
Страница 114: ...108 USER GUIDE DS 200iQ DS 600iQ 7 TROUBLESHOOTING GUIDE...
Страница 117: ...111 USER GUIDE DS 200iQ DS 600iQ 8 TECHNICAL SPECIFICATIONS...
Страница 129: ...123 USER GUIDE DS 200iQ DS 600iQ 9 DISPOSAL INSTRUCTIONS...