AH20 Robot Maintenance Manual
58
Document Version V1.0.1 (09-21-2022)
Step 4
After removing the old control assembly, install a new controller
assembly in the base and tighten the screws. Reconnect all the cables to the
corresponding connectors of the new controller assembly. At the time of
installation, users shall check whether the connectors match the line labels, as
shown in the figure below.
Step 5
Restore the back and side panels of the base.
5.4
Replacement and maintenance of IO-free-distribution PCBA
The IO-free-distribution PCBA is located on the connector panel of the base. To
replace and maintain it, the base connector panel needs to be removed. The position of
the IO-free-distribution PCBA is shown in Figure 5-10.
Содержание AH20
Страница 1: ......
Страница 98: ...AH20 Robot Maintenance Manual 84 Document Version V1 0 1 09 21 2022...