PF Conveyors | Installation, Operation & Maintenance Manual
7
Commissioning
/ Puesta en funcionamiento
u
Checking Controller
/
Verificar el controlador
START
STOP
RESET
EN
1
Verify the power to the control
panel and both controls
display “0”.
2
Turn the control switch to
<START> (
).
3
Verify the conveyor belt is
moving towards the OAT /
front of the kitchen.
4
The control will read 1800
(factory default) or the speed
to which it has been set.
ES
Verificar que la corriente eléctrica
hacia el panel y hacia ambos contro-
ladores indiquen 0
Girar el controlador para iniciar
Verificar que la cinta se esté movi
-
endo hacia la mesa de armado de
pedidos / parte delantera de la cocina
El controlador indicará 1800 (prede-
terminado de fábrica) o la velocidad a
la que se programó
START
STOP
RESET
EN
5
Create an error by discon-
necting the control cable
from the motor.
6
Verify the control displays
AL42.
7
Turn the control switch to
<STOP> (
).
8
Reconnect the control cable.
ES Crear error desconectando el cable
de control del motor
Verificar que el controlador indique
AL42
Girar el controlador para detener
( )
Volver a conectar el cable del control
Repeat this procedure for the second conveyor.
Repetir este procedimiento para la segunda cinta transportadora.
IIf the alarm condition does not clear, refer to the manufacturer’s manual for the control.
Si la alarma no se apaga, consultar el manual del fabricante del controlador.