
_____________________________________________________________________________________________
Q3
ENERGIE
Installation and operating instructions Q
X
³ series
31/109
Version 1.0, Stand 27.04.2015
Installation and operating instructions
Q
X
³ series
4.5.3
Q
X
³10000-18000
Pictographs/Symbols:
Pos
DESCRIPTION
1
DC disconnecter switch
2
USB port
3
Communication port, selectable Ethernet / RS485
4
Potential-free make contact
5
Communication port RS485
6
Sensor connection (radiation, Temperature, S0)
7
Remote connection (connection for external ripple control receiver)
8
AC connection / grid connection (3-phase; 3L, N, PE)
9
Connection for fan, left
10
Connection for fan, right
11
Earthing point
12
6 x DC plug-in connectors (SUNCLIX) for connecting the PV + strings
13
6 x DC plug-in connectors (SUNCLIX) for connecting the PV - strings
14
Ventilation inlet / ventilation grid