COMPACT 2 NDT
User Manual
5190-0-0002
PROTEC GmbH & Co. KG, In den Dorfwiesen 14, 71720 Oberstenfeld, Germany
21 von 65
5
Handling / Operation
CAUTION!
Upon first operation and each refilling of a developer check
the function of the circulation pump and vent the pump if required.
CAUTION!
Never start the machine up unless it is filled with liquid!
CAUTION!
Do not place any object on the processor.
NOTE
High or low room temperature may influence the function of the film processor
machine.
WARNING!
Hot air van escape when opening the light protection cover!
Surface film feed tray (sheet) can be hot!
5.1
Operation
5.1.1
Before use
1
Close water-drainage stop cock
2
Open water tap
3
Switch processor on
4
Check liquid level in replenishment and drainage collecting containers
5
Wait until the developer temperature is reached. If the temperature has not been reached
6
Run cleaning films through processor
5.1.2
Working procedure
7
Processing films:
Open light protection cover. Important: Put film first on
left
side of infeed tray and then feed in.
During processing films please watch the display „Infeeding film“.
NOTE
Put the film first on left side of infeed tray and then feed in.
CAUTION!
During processing films not the display „Infeeding film”
5.1.3
After work
8
Switch processor off
9
Close water tap
10
Open water-drainage stop cock and drain water out of the machine.