5.28
•
After achieving required tightness, tighten counter nut (4).
FIGURE 5.13
I STAGE OF FRONT CHAIN GEARING
(1) chain, (2) tensioner toothed cog, (3) tensioner bolt, (4) counter nut, (5) tightening nut
Check drive chain tightness of the I stage of transmission gear:
•
every 10 hours of work - before greasing chain.
5.2.17 OPERATION NO. 17 – INSPECTION OF TIGHTNESS OF FRONT CHAIN
TRANSMISSION (II STAGE)
Содержание T740
Страница 4: ......
Страница 37: ...2 17 FIGURE 2 2 Locations of information and warning stickers Labelling in line with table 2 1 ...
Страница 38: ...2 18 ...
Страница 68: ...3 30 FIGURE 3 22 Lighting panel Description of markings on table 3 5 ...
Страница 70: ...3 32 ...
Страница 108: ...5 20 FIGURE 5 6 TRAILER GREASING POINTS CHASSIS ...
Страница 109: ...5 21 FIGURE 5 7 TRAILER GREASING POINTS VERTICAL CONVEYOR ...
Страница 110: ...5 22 FIGURE 5 8 TRAILER GREASING POINTS PARKING BRAKE FIGURE 5 9 TRAILER GREASING POINTS REAR CHAIN GEARING ...
Страница 111: ...5 23 FIGURE 5 10 TRAILER GREASING POINTS FRONT CHAIN GEARING ...
Страница 135: ...NOTES ...
Страница 136: ... ...