
23
Wiring diagram CDLb
CDLb 6 - 120 g/h with external storage module
INTERNAL
INPUTS
OUTPUTS
Metering container acid full
Metering container chlorite full
Pre-storage module overflow
Pre-storage module
new batch
Acid vessel low
Acid vessel empty
Chlorite vessel low
Chlorite vessel empty
Mixer vessel water pre-storage
* If
u
s
in
g
t
h
e
in
p
u
t,
re
m
o
v
e
t
h
e
j
u
m
p
e
r.
Mixer vessel dilution
Mixer vessel overflow
External fault
(gas detector)
Pre-storage module full
Control acid metering pump
Control chlorite metering pump
Warning
Operation
max. 230 V
Alarm
Outlet valve acid
Outlet valve chlorite
Chlorine dioxide valve
Water valve
Metering pump, acid
Chlorite metering pump
Mains connection 90-230 VAC
(dependent on version)
Input level switch minimum
Limit stop chlorine dioxide
Metering pump or higher-level control
Pre-storage module empty
Wiring diagram Bello Zon
®
type CDLb with
external pre-storage vessel
Wiring diagram CDLb
66