
9
Installation
CAUTION!
Warning against illegal operation
Observe the regulations that apply where the device is
installed.
A wiring diagram is contained in the appendix.
9.1 Installation, hydraulic
P_PMA_BEZ_0117_SW
1
2
3
4
5
6
2
9
10
11
12
8
7
Fig. 9: Typical installation of CDLb with external pre-storage module
1
Filter insert
2
Shut-off valve
3
System isolator
4
Angle valve
5
Water meter
6
Point of injection, Bello Zon
®
CDL
7
Sample water line (or sampling tap)
8
Measuring station
9
Suction lance with Bello Zon
®
acid in safety col‐
lecting pan
10
Suction lance with Bello Zon
®
chlorite in safety col‐
lecting pan
11
3-way valve
12
External storage module
The following sub-chapters contain notes for the hydraulic installation.
9.1.1 Filter insert
To protect the plant and fittings, first of all install a filter insert in the diluting
water line.
Installation
21