December 2014
7-83
7.8.2.2
Screen Description
The following describes the
Signal Monitoring
screen:
Figure 50.
Selected installation; date and time.
Spectrum.
Power measurement over time (shows span time).
MER and C/N measurement over time (shows span time).
Signal monitoring started.
LNB, Selected band; battery level.
Signal information window 1:
Frecuency
: frequency at which signal is locked;
Profile
(only for
DVB-T2 signals): Base or Lite;
PLP identifier
(only for DVB-T2 signals):
identifier of the layer being measured,
TS Hierarchy
(table hierarchy at
the transport stream)
TS Priority
(packet priority at the transport
stream).
Signal information window 2:
Power, C/N, MER measurements of the signal over time. It shows on
screen only the span time selected in settings.
Signal information window 3:
Elapsed
: Time elapsed since the beginning of the monitoring.
Samples
: Samples taken since the beginning of the monitoring.
Space left
: Space left in the memory to save data.
Содержание HD Ranger +
Страница 1: ...HD RANGER TV SATELLITE ANALYSER 0 MI1914...
Страница 15: ...December 2014 2 7 2 3 Equipment Details Front View Figure 4...
Страница 16: ...2 8 December 2014 Lateral view Figure 5 Top view Figure 6 Optical Option Refer to annex...
Страница 21: ...December 2014 2 13 SETTINGS MENU Option available for terrestrial band Option available for satellite band...
Страница 22: ...2 14 December 2014 INSTALLATIONS MANAGEMENT PREFERENCES MENU Figure 7...
Страница 28: ...2 20 December 2014 TV Mode Figure 16 FULL TV Figure 17 TV SPECTRUM MEASUREMENT Figure 18 TV SERVICE DATA...