Identify the final position and keep ‘3U’ space for this installing, and it is
recommended to be installed below to UPS.
Note that you already installed a ‘rail kit’ to rack cabinet for this operation, and
‘2U’ rail kit is recommended to be selected.
1. Install ‘Ear bracket’ to the unit by the M4 screws(flat head).
2. Slide the unit into ‘rail kit’ and make sure tighten the ‘rack mounting screw’ .
Note:
This unit is suitable for 19 inch rack cabinet installation with a minimum of 800mm
depth.
3. Plug ‘Battery power cable’ to UPS’s external battery connector.
Note:
This ‘Battery power cable’ may have different plug according to the number of
battery inside of this unit, please check the ‘Voltage ’ parameter on rear-panel if it
matches the UPS before connection.
The battery number can be adjusted from ‘16pcs*1 strings’ to ‘20pcs*1 strings’ for
this unit, if you ordered other type EBM, please contact with local sale center.
If installing additional unit, place it next to the previous unit in their final location.
Tower position installing
Содержание VFI 10000 RTG
Страница 12: ...9 EBM fuse 14 EBM plug 15 EBM connector 2 3 Circuit diagram...
Страница 38: ...35 The event log menu By pressing on the menu of Event log the display would enter the next event menu tree...
Страница 40: ...37...
Страница 42: ...39...