16
4111-0012 — Sept. 2018
© 2018 Systems, LLC
INSTALLATION
A— Front of Dock Pit
B— Dock Leveler Frame
C— Side Pit Curb Angle
D— Gap [3/4 in. (19 mm)
Minimum]
E— Pry Locations
F— Rear Hinge Frame
Angle
G— Rear Pit Curb Angle
H— Flare Bevel Weld, Typical
(To Fit Spacing)
8. With rear hinge frame angle (
F
) tight against rear
pit curb angle (
G
), perform/check the following:
• Pry between the platform and rear hinge frame
angle at locations (
E
) to make sure rear edge of
platform is parallel to the rear hinge frame angle
(
F
).
• Gap (
D
) must exist equally along both sides of
leveler so weather seal (if equipped) will not bind
during dock leveler operation.
9. If gap (
D
) cannot be obtained equally at both
sides of leveler, grind or add material at the rear
edge of rear hinge frame angle (
F
) as needed.
10. Allow the dock leveler to rest fully on the shim
stacks. Check that a smooth and level transition
exists between the dock floor and the dock leveler
platform. Add or remove shims as necessary until a
smooth transition is obtained.
11. If leveler cannot be squared and/or made level
as instructed in steps 8-10, contact Systems, LLC
Technical Services.
Figure 11
G
H
A
B
E
C
F
C
D
6 in.
(152 mm)
3/8 in.
(9.5 mm)
D
Содержание LHP Series
Страница 13: ...11 4111 0012 Sept 2018 2018 Systems LLC This page intentionally left blank INSTALLATION ...
Страница 25: ...23 4111 0012 Sept 2018 2018 Systems LLC INSTALLATION This page intentionally left blank ...
Страница 31: ...29 4111 0012 Sept 2018 2018 Systems LLC MAINTENANCE This page intentionally left blank ...
Страница 42: ...40 4111 0012 Sept 2018 2018 Systems LLC PARTS B A D C Lip and Platform Parts ...
Страница 47: ...45 4111 0012 Sept 2018 2018 Systems LLC PARTS This page intentionally left blank ...
Страница 49: ...47 4111 0012 Sept 2018 2018 Systems LLC PARTS This page intentionally left blank ...
Страница 50: ...48 4111 0012 Sept 2018 2018 Systems LLC This page intentionally left blank MISCELLANEOUS ...