19
4111-0012 — Sept. 2018
© 2018 Systems, LLC
20. Remove the Shipping Bar (
C
) by grinding the
tack welds that hold it in place during transport.
21. When all welding has been completed, paint all
the welds and shims.
22. Install the dock bumpers as required.
23. Proceed to “Install Control Panel and Wiring” on
Page 20.
Figure 13
Install Dock Leveler (continued)
LH models are shipped with a front frame section
(
C
) installed. This temporary frame holds the leveler
frame at the correct dimensions until the leveler is
permanently anchored into place. Only then should
it be removed.
There are four cap screws and nuts that fasten the
T-frame to the rest of the leveler frame. Tack welds
may also be used.
Offset w/Load Over Center
(Acceptable)
Stepped
(Acceptable)
Pyramid
(Preferred)
Shim Stacking Methods
Offset w/Load Over Edge
(Not Acceptable)
Straight
(Not Acceptable)
INSTALLATION
Содержание LHP Series
Страница 13: ...11 4111 0012 Sept 2018 2018 Systems LLC This page intentionally left blank INSTALLATION ...
Страница 25: ...23 4111 0012 Sept 2018 2018 Systems LLC INSTALLATION This page intentionally left blank ...
Страница 31: ...29 4111 0012 Sept 2018 2018 Systems LLC MAINTENANCE This page intentionally left blank ...
Страница 42: ...40 4111 0012 Sept 2018 2018 Systems LLC PARTS B A D C Lip and Platform Parts ...
Страница 47: ...45 4111 0012 Sept 2018 2018 Systems LLC PARTS This page intentionally left blank ...
Страница 49: ...47 4111 0012 Sept 2018 2018 Systems LLC PARTS This page intentionally left blank ...
Страница 50: ...48 4111 0012 Sept 2018 2018 Systems LLC This page intentionally left blank MISCELLANEOUS ...