Replacement of Parts - Page 44
PL5
P
L
6
P
L
9
P
L
1
0
P
L
4
P
L
1
P
L
8
P
L
7
P
L
3
Test
Switch
Override
Normal
T.S/w
Control
Box
U
L
0
0
0
6
9
A
Fig. 52
6.13
Test Switch
1.
Gain General Access - See Section 6.1, Paragraph 1.
2.
Disconnect the two electrical (spade) connectors from
the switch.
3.
Note which way the switch is fitted, compress the clips
on the switch body and push it out of the control box.
4.
Fit the new switch as shown with the spade connectors
to the bottom.
5.
Re-assemble in reverse order.
6.14
Overheat Cut-Off Device
1.
Gain General Access - See Section 6.1 complete.
2.
Disconnect the overheat thermostat leads.
3.
Remove the two screws securing the overheat
thermostat to the heat exchanger.
4.
Ensure that the mounting plate is clean, smear some
heat conductive grease onto the plate and secure the
new thermostat to the heat exchanger.
5.
Reconnect the leads (the polarity is not important).
6.
Re-assemble in reverse order.
Содержание Ultra 2
Страница 6: ...Installation Requirements Page 6 Fig 1 ...
Страница 7: ...Installation Requirements Page 7 Fig 2 ...
Страница 9: ...Installation Requirements Page 9 ...
Страница 37: ...Routine Maintenance Page 37 ...
Страница 51: ...7 Wiring Diagrams Page 51 ...
Страница 52: ...Wiring Diagrams Page 52 Ultra 2Dv ...
Страница 53: ...Wiring Diagrams Page 53 Ultra 2 ...
Страница 54: ...54 Fault Finding Part No 405 0522 8 Fault Finding Guide Page 54 ...
Страница 55: ...Part No 405 0522 Fault Finding 55 Fault Finding Guide Page 55 ...
Страница 56: ...56 Fault Finding Part No 405 0522 Fault Finding Guide Page 56 ...
Страница 57: ...Part No 405 0522 Fault Finding 57 Fault Finding Guide Page 57 ...
Страница 58: ...9 Short List Of Spare Parts Page 58 ...