6.8 Guide for commissioning
Tab. 6: Guide for commissioning
1.
System location
2.
Customer
3.
Boiler type/Designation
4.
Serial number
5.
Characteristic gas values
Gas Type
..........................
6.
Natural Gas / LPG
kWh/m³
..........................
7.
Have all pipelines and connections been checked for tightness?
8.
Exhaust gas system checked?
9.
Gas pipeline checked and purged?
10. Static pressure measured at the gas valve inlet?
mbar ...............................
11. Free wheeling of pumps checked?
12. Filling the heating plant
13. Used water additives
...............................
14. Gas flow pressure measured at full load at the gas valve inlet?
mbar ...............................
15. Gas injector pressure measured at full load at the gas valve outlet?
mbar ...............................
16. CO
2
-content at low load
% ...............................
17. CO-content at low load
ppm ...............................
18. CO
2
-content at full load
% ...............................
19. CO-content at full load
ppm ...............................
20.
Function test:
Heating mode
21.
DHW operation
22.
Programming:
Time /date
23.
Comfort setpoint heating circuit 1/2
°C ...............................
24.
Setpoint DHW
°C ...............................
25.
Automatic day time programme
Clock ...............................
26.
Heating curve checked?
27. Tightness of the flue system checked in operation (e.g. CO
2
test in annular gap)?
28. Customer instructed?
29. Documents handed over?
Only components tested and marked according to he respective standard have been used.
To ensure the heat source operates reliably and economically for a long period,
we recommend annual maintenance for the heat source.
Date /signature
Company stamp
...............................
Commissioning
36
Paramount three 30-115 kW
396532 05.11
Содержание Gas condensing boiler
Страница 1: ...Installation operation and maintenance manual Gas condensing boiler Paramount three 30 115 kW ...
Страница 21: ...Fig 5 Connection plan Prior to installation 396532 05 11 Paramount three 30 115 kW 21 ...
Страница 24: ...4 8 Legend Prior to installation 24 Paramount three 30 115 kW 396532 05 11 ...
Страница 133: ...Space for notes 396532 05 11 Paramount three 30 115 kW 133 ...
Страница 134: ...Space for notes 134 Paramount three 30 115 kW 396532 05 11 ...
Страница 135: ...Space for notes 396532 05 11 Paramount three 30 115 kW 135 ...