6. Commissioning
Danger! Danger of life by improperly performed work!
Commissioning must only be carried out by an GasSafe heating engineer! The
heating specialist checks the tightnesss of pipelines, the correct functioning of all
regulating, control and safety installations and measures the combustion values.
In case of incorrect operations exists the danger of considerable damage to per-
sons, environment and property!
6.1 Menu-Commissioning
During first commissioning, the menu Commissioning is showing up one-time.
1.
Select
Language
and confirm by pressing OK
2. Select
Year
and confirm
3. Set
Date a
nd confirm
4. Set
Time
and confirm
5. Finalize by pressing OK
Note:
If the menu commissioning is interrupted by pressing ESC, the menu is
showing up again during the next switch-on of the device.
6.2 Switching on
Danger
! Danger of scalding!
Hot water may exit from the blow pipe of the safety
valve.
1.
Switch on boiler electrical isolation
2.
Open gas shut-off device (
1
) and the water shut off valves (
2
and
3
)
3. Open front panel cover and switch on operating switch on the front panel of
the boiler
Commissioning
396532 05.11
Paramount three 30-115 kW
33
Содержание Gas condensing boiler
Страница 1: ...Installation operation and maintenance manual Gas condensing boiler Paramount three 30 115 kW ...
Страница 21: ...Fig 5 Connection plan Prior to installation 396532 05 11 Paramount three 30 115 kW 21 ...
Страница 24: ...4 8 Legend Prior to installation 24 Paramount three 30 115 kW 396532 05 11 ...
Страница 133: ...Space for notes 396532 05 11 Paramount three 30 115 kW 133 ...
Страница 134: ...Space for notes 134 Paramount three 30 115 kW 396532 05 11 ...
Страница 135: ...Space for notes 396532 05 11 Paramount three 30 115 kW 135 ...